Main Floor Sheathing
Next up we sheathed the top of the kitchen and main floor bathroom, where the 3/8" worth of old lino & tile had been removed. It's now flush with the rest of the floors, which have 3/8" hardwood coverage. We're placing a floating snap-lock engineered hardwood over most of these areas. We considered removing all the old hardwood, but I swear there are 100 nails holding each board down... so we reconsidered.