Spring Update

Spring 2104 has arrived, marking that we've been working on this retrofit for one year! Optimism is high, but these things always take longer than you think. The push is on to move in by late summer/fall. Gauntlet thrown, etc... realistically we'll move in when it's ready.

We've ordered kitchen cabinets from Ikea, a full set of amazing LED panel lights from LED Lights Canada, some industrial strength drawer sliders from Hettich for the attic built-in wardrobes, have Duxton pricing out the rest of the window package.. let the bonanza begin.

NuEnergy helped out again with a ventilation ducting take-off from my design. I've just picked that package and will be installing the dedicated ventilation system Easter long weekend. Until then, here are some general up to date photos.